What do you do for entertainment at work?
What do you do for entertainment at work?
We crush random things with an excavator , such as a kids tricycle ( the kid was done with it, got a new one)

http://www.youtube.com/watch?v=3Xjy_x1VG3E

http://www.youtube.com/watch?v=3Xjy_x1VG3E
Climb tower structures and repel chest facing the ground. The normal procedure would be coming down with your chest facing up. Like the SWAT guys do. Do that same thing facing the dirt. Thats a rush!
Moral of the story, watch where you go face first.
Trending Topics
Yeah I have done that too. I threw some empty steel 55 gal barrels in the trash compactor. That was pretty cool.
Sometimes I will grab a pallet jack and ride it in the shop (like 100'x100' building) like it's a scooter.
We also have couches in the loft of the shop and I go up there sometimes to take a nap on my lunch hour.
Sometimes I will grab a pallet jack and ride it in the shop (like 100'x100' building) like it's a scooter.
We also have couches in the loft of the shop and I go up there sometimes to take a nap on my lunch hour.
Some of my bros from his Chevy house mechanic days.
classics but good
nipple in an antifreeze jug, plug into air hose, and shove in the bathroom when someones on the pot...
We do it on the ranch too....shoot random things at other things with compressed air.
And pretty much plan in my head the mods for all our trucks on the ranch...
classics but good
nipple in an antifreeze jug, plug into air hose, and shove in the bathroom when someones on the pot...
We do it on the ranch too....shoot random things at other things with compressed air.
And pretty much plan in my head the mods for all our trucks on the ranch...
For "entertainment"?
I take a requirement that has been in the works for 6 months, passed through 5 or 6 "Experts" hands, a couple of "Project managers", and several "Planning Meetings" to take care of all specifications needed to complete the project,.....and find 5 or more "Show Stoppers" in 30 minutes when the project is given to me to accomplish, usually with one or two days to final completion deadline....then watch these "Experts" try to see how they're going to cover their mistakes (without their bosses finding out) quickly enough to allow for the project to be completed and the deadline to be met.
As you can guess, I was handed another project last night that was in planning for over a year, and that HAS to be completed by COB Monday.....
It's going to be an interesting day......
I take a requirement that has been in the works for 6 months, passed through 5 or 6 "Experts" hands, a couple of "Project managers", and several "Planning Meetings" to take care of all specifications needed to complete the project,.....and find 5 or more "Show Stoppers" in 30 minutes when the project is given to me to accomplish, usually with one or two days to final completion deadline....then watch these "Experts" try to see how they're going to cover their mistakes (without their bosses finding out) quickly enough to allow for the project to be completed and the deadline to be met.
As you can guess, I was handed another project last night that was in planning for over a year, and that HAS to be completed by COB Monday.....
It's going to be an interesting day......






