![]() |
ARP Head Studs
All,
Just want to confirm that ARP 247-4202 is the correct part number for a 24V 5.9. Also, let me confirm installation procedures; 1. Remove head bolt, one at a time, in the correct torqueing sequence, and install the new head stud. 2. Put anti-seeze compound on head stud, and tighten until it bottoms out. Then, back off stud 1/8 turn. 3. Torque head nut until reaching 96ft/lbs. 4. Continue until all studs are installed. 5. In proper head nut torqueing sequence, torque nuts in increments until 115-120 ft/lbs is achieved. Is this correct? Thanks for your time. BARTMAN |
Pt number is good and all the steps look good to me.
Have fun |
ARP Head Studs
Jambbii,
Is that the same for a 12v ?:D What is with the 1/4 extra turn stuff???? [eyecrazy] Thanks, Wayne |
Yeah same routine, do you mean the 1/8 turn? Well if that is what you are refering to then he means backing the stud 1/8 turn from bottoming out. I guess if you bottom the stud out (screw it all the way in) then as the engine heats up then everything can expand and push the studs up just a tad . I made the mistake of bottoming the studs out the first head gasket and I thinks thats why it blew.
|
| All times are GMT -5. The time now is 01:53 AM. |
© 2026 MH Sub I, LLC dba Internet Brands