Time for some work
Time for some work
The rest of March is booked for me but I have the following things that are in need of install / adjusting, maybe sometime in early April???
1) Edge Juice w/ Attitude
2) 2" front leveling spacers
3) New rims and tires (thanks TJ)
4) Valve springs adjusted, they have never been done and I am pushing 195k
5) maybe a new exhaust manifold if I get it in time.
6) Remove Silencer Ring
Let me know. I am a diesel dummy so I need help.
1) Edge Juice w/ Attitude
2) 2" front leveling spacers
3) New rims and tires (thanks TJ)
4) Valve springs adjusted, they have never been done and I am pushing 195k
5) maybe a new exhaust manifold if I get it in time.
6) Remove Silencer Ring
Let me know. I am a diesel dummy so I need help.
Trending Topics
the hardest part of that whole project is drilling the exhaust manifold for the temp probe and not messing up the turbo, but since you have a new one to put in as well, you have a very easy install day ahead of you
Anyone in the BelAir area want to help with a Edge install this afternoon? I think I can do it myself but would love a hand as I am brand new to diesel trucks / engines.
I am kind of in the same boat as well. I wish I was not working this weekend. I would have gladly tried to help out. I am in the area but working the night shift this weekend. Getting ready to roll out again now.
Drilling and tap looks to be the hardest after reading the distructions. I have to get the tool/bit to tap it.
Peace
Drilling and tap looks to be the hardest after reading the distructions. I have to get the tool/bit to tap it.
Peace



This is true

Gonna try to take it out next weekend and see what breaks next.